Our pool reconstruction project start date is getting closer. At this time, all of our pools will stay open through mid September as our building permits are still with the city of Steamboat Springs. We will let you know the lap pool area closure date as soon as we have it available. The hot pool, spas, and heart spring will remain open during construction.
Our semi-annual pool maintenance week is scheduled for Sept. 18 – Sept. 22. All pools will be closed during this time. As always, we will reopen the pools as soon as we are able. We have also scheduled the refurbishing of our water slides during this time to minimize the impact on our pools. The work on our slides will be done Sept. 18 -29, and our newly refurbished water slides will reopen this winter!